- Metalicity has confirmed high-grade, near-surface gold mineralisation at the Leipold prospect which is part of the Kookynie Gold Project
- The Kookynie Gold Project is located within the Eastern Goldfields region of WA
- Metalicity conducted phase two reverse circulation drilling which aimed to step out and continue to confirm previously identified mineralisation
- Latest results have intersected up to 21.03 grams per tonne of gold and 35.23 grams per tonne of gold
- Drilling also extended the Leipold mineralisation footprint to 700 metres
- Assays for 24 holes are pending at the lab, while the last 13 holes were dispatched on August 23