De Grey Mining: Receives results from Mallina process design study

Must read

Steve Sam
Steve Sam is a financial reporter, analyst, and commentator with a strong focus on banking technology, digital payments, and the future of financial services.

De Grey Mining Receives results from Mallina process design study

  • De Grey Mining (DEG) receives results for two important process flowsheet selections for its Mallina gold project, including the Hemi Deposit, in Western Australia
  • The flowsheets are the outcome of a nine-month trade-off study into the preferred process design for the project by pre-feasibility study (PFS) process engineer Wood Australia
  • De Grey says process flowsheet selections — comminution circuit and oxidation circuit — represent the best technical, environmental and economic outcomes for its plant
  • Each of the flowsheets represents key inputs into a planned PFS for Mallina, which is due in the September quarter of 2022
  • De Grey shares are up 1.26 per cent and trading at 96 cents per share at 12:42 pm AEST
- Advertisement -
Exit mobile version